Sign In | Join Free | My xuijs.com |
|
Brand Name : Saibo
Model Number : C purlin
Certification : CE/ISO
Place of Origin : China
MOQ : 1 set
Price : negotiation
Payment Terms : L/C, T/T
Supply Ability : 300 sets per year
Delivery Time : 90 days
Packaging Details : Suitable for ocean shipment
Product Name : CPurlin Roll Forming Machine
Shaft diametecrr : ¢70mm, 45# forge steel
Steel thickness : 1.5-3.0mm
Station : About 14 stations
Roller material : Gcr15
Cutting system : After roll forming
Speed : 0-15m/min
Main power : 15kw
Hydraulic power : 5.5KW
Material : GI and carbon steel
CPurlin Roll Forming Machine
1. Main speficication:
Machine can produce C purlin. Through change rings on the shafts adjust size. Machine include 3T manual decoiler, coil width: 500mm, expand range: 420-510mm. Machine adopts one station of flatten system, 7 rollers, upper is three rollers, down is four rollers., According to customer request, will has two units punching system and post cutting system.
2. The Chart of Process Flow
Uncoiler— Flatten—2units punching system—Roll Forming—Post-cutting—Out table
3.Machine Detailed Parameters
1 | Machine structure | Wall panel structure |
2 | Total power | Motor power-15kw Hydraulic power-5.5kw |
3 | Roller stations | About 14 stations with one station of rectify |
4 | Productivity | 0-15m/min |
5 | Drive system | By chain |
6 | Diameter of shaft | ¢70mm, 45# forge steel |
7
| Voltage | 380V 50Hz 3phases (Customized) |
4.Specification of Components
No | Technical Specification & Remark | |
1 | Main Roll Forming Machine
|
|
2 | Machine structure:
|
|
3 | Post cutting system
|
|
5.Machine pictures for reference
6.Warranty
1: Guaranteed against malfunctions due to manufacturing defects for 1 year after date of shipment. Repairs will be made free of charge.
2: Repairs will not be performed free of change even during the guarantee period in the follow circumstances
- Damage occurs due to a natural disaster
- Malfunction occurs due to user error
- Malfunction occurs due to modifications
- Malfunction occurs due to further movement or shipment after installation
3:Air ticket, transportation cost, hotel, meals and 100$ per day shall be for purchaser’s account if manufacturer’s engineer has to be send to purchaser’s factory to maintain the machine during the guarantee period.
![]() |
C Purlin Cold Roll Forming Machine Wall Panel Structure 15KW Images |